Something went wrong while setting issue due date.
Redesign lifecycle class
Open
Redesign lifecycle class
Redesign lifecycle class
assigned to @oalexa
added PJ1802-0188 label
82-redesign-lifecycle-class
to address this issue created branch 82-redesign-lifecycle-class
to address this issue
mentioned in merge request !78 (merged)
changed milestone to %FusionDirectory Orchestrator 1.2
added plugin-lifecycle label